LAST VERIFIED DATE

What is LAST VERIFIED DATE?

LAST VERIFIED DATE meaning The Last Verified date is the most recent date on which all of a clinical study’s information on ClinicalTrials.gov was confirmed as accurate and current by the responsible party. This date may be different from the Last Updated date. If a study with a status of Recruiting; Not yet recruiting; or Active, not recruiting has not been confirmed within the past 2 years, the study’s Recruitment status is shown as Unknown. (See also Record Verification Date data element on ClinicalTrials.gov.)

 

reference: Glossary of Common Site Terms – ClinicalTrials.gov

Tags: